I looove wires and tubes.

  1. running the tubes to from the valve to the drink.
  2. Mount the Co2 manifolds.
  3. Mount the additional Co2 regulator.
  4. Run Co2 lines from manifolds to drinks.
  5. Create faucet for drinks (1 inch for 12 tubes, thinking maybe 2 1/2" or 3/4" that merge into a 1")
  6. Mount Relay boards
  7. Mount a power strip
  8. Slightly tweak the current power layout scheme to fit 6 on each side.
  9. Run eletrical wiring (Neutral)
  10. Run eletrical wiring (Hot)
  11. Test wiring layout
  12. Do a wet run test
  13. Deconstruct it
  14. Ship to Maker's Faire

A little FYI, crimping wire sucks

Showing a bit of leg

Tubing finally done

Wide view, only thing left to do is running 1 more wire

Co2 manifolds are mounted and ready for hooking up

No comments posted yet.

Post a Comment

Please add 7 and 3 and type the answer here: